Abstract:

The plan to harness the Santong River's surface water as a potential source for an independent Micro Hydro Power Plant aims to supply electricity to remote communities (standalone/off-grid) while also linking to the State Electricity Company's distribution network. It is essential to conduct a thorough study and analysis concerning water utilization, focusing on both reliable discharge and the prospective energy output of the Micro Hydro Power Plant, which depends on the water discharge and the electrical energy requirements. This approach ensures that the usage of this water source does not disrupt the downstream water utilization system. The water balance analysis for the Santong Micro Hydro Power Plant takes into account several factors: the reliable discharge at the dam, the water needed for river maintenance (ecosystem flow), potential reliable discharge, water requirements (power demand), and any spillover into the Sidutan River. The Santong Micro Hydro Power Plant has a production capacity of 1000 KW (1 MW), with operational requirements of a maximum of 1.5 m³/sec and a minimum of 0.4 m³/sec. The water balance analysis provides insights into the operational reliability of the plant, covering a total of 324 observation cycles: 264 cycles or 81% indicate ON Operation, while 51 cycles or 16% reflect OFF Operation, and 9 cycles or 3% involve Maintenance. In 2018, a notable decline in operational reliability due to limited reliable discharge was observed at the dam, exacerbated by earthquakes which can alter soil composition and surface flow. This decline was further influenced by signs of a Weak to Moderate El Niño (drought) in that year, as evidenced by discharge data showing 2018 registered the lowest average discharge within the 2015-2023 timeframe.

You might also be interested in these eBooks

Info:

Pages:

97-105

Citation:

Online since:

June 2026

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2026 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] M. Paloboran, T. A. Pangruruk, W. Hasim, A. M. T. Ali, S. Muflihat, And F. A. Kaju, "The Impact Of Varying Water Turbine Blade On Performance Of Pico Hydro Power Plants," Jurnal Konversi Energi Dan Manufaktur, 2025.

DOI: 10.21009/Jkem.10.2.2

Google Scholar

[2] W. Grebski And M. Grebski, "Project Of Micro-Hydroelectric Power Generation System - Case Study," Production Engineering Archives, Vol. 28, No. 2, 2022.

DOI: 10.30657/Pea.2022.28.21

Google Scholar

[3] C. P. Jawahar And P. A. Michael, "A Review On Turbines For Micro Hydro Power Plant," 2017.

DOI: 10.1016/J.Rser.2017.01.133

Google Scholar

[4] B. A. Nasir, "Design Considerations Of Micro-Hydro-Electric Power Plant," In Energy Procedia, 2014.

DOI: 10.1016/J.Egypro.2014.06.003

Google Scholar

[5] S. Mejiartono, M. F. Hikmawan, And A. S. Nugraha, "Numerical And Experimental Study Of Mixed Flow Pump As Turbine For Remote Rural Micro Hydro Power Plant Application," Journal Of Mechatronics, Electrical Power, And Vehicular Technology, Vol. 13, No. 2, 2022.

DOI: 10.14203/J.Mev.2022.V13.125-136

Google Scholar

[6] M. Rumbayan And R. Rumbayan, "Feasibility Study Of A Micro Hydro Power Plant For Rural Electrification In Lalumpe Village, North Sulawesi, Indonesia," Sustainability (Switzerland), Vol. 15, No. 19, 2023.

DOI: 10.3390/Su151914285

Google Scholar

[7] A. Tapia, P. Millán, And F. Gómez-Estern, "Integer Programming To Optimize Micro-Hydro Power Plants For Generic River Profiles," Renew. Energy, Vol. 126, 2018.

DOI: 10.1016/J.Renene.2018.04.003

Google Scholar

[8] I. I. Novendra, I. M. Wirawan, A. Kusumawardana, And A. K. Latt, "Optimization Of Load Frequency Control Using Grey Wolf Optimizer In Micro Hydro Power Plants," Journal Of Mechatronics, Electrical Power, And Vehicular Technology, Vol. 14, No. 2, 2023.

DOI: 10.14203/J.Mev.2023.V14.166-176

Google Scholar

[9] Asian Development Bank, Renewable Energy Financing Schemes For Indonesia, No. November. 2019.

Google Scholar

[10] Munawir, Mahidin, Y. Away, Azwar, And W. I. N. W. Ismail, "Mapping And Analysis Of Local Potential For New And Renewable Energy And Its Conversion Technology In Aceh-Indonesia," Renewable And Sustainable Energy Transition, Vol. 8, 2025.

DOI: 10.1016/J.Rset.2025.100126

Google Scholar

[11] G. M. Shafiullah Et Al., "Prospects Of Hybrid Renewable Energy-Based Power System: A Case Study, Post Analysis Of Chipendeke Micro-Hydro, Zimbabwe," Ieee Access, Vol. 9, 2021.

DOI: 10.1109/Access.2021.3078713

Google Scholar

[12] R. Syahputra And I. Soesanti, "Renewable Energy Systems Based On Micro-Hydro And Solar Photovoltaic For Rural Areas: A Case Study In Yogyakarta, Indonesia," Energy Reports, Vol. 7, 2021.

DOI: 10.1016/J.Egyr.2021.01.015

Google Scholar

[13] L. Tria Melati, I. Supriyadi, And Y. Ali, "Strategi Pengembangan Pembangkit Listrik Tenaga Air Mini/Mikro Hidro Di Indonesia," G-Tech: Jurnal Teknologi Terapan, Vol. 6, No. 2, 2022.

DOI: 10.33379/Gtech.V6i2.1319

Google Scholar

[14] S. Kanata, "Kajian Ekonomis Pembangkit Hybrid Renewable Energi Menuju Desa Mandiri Energi Di Kabupaten Bone-Bolango," Jurnal Rekayasa Elektrika, Vol. 11, No. 2, 2015.

DOI: 10.17529/Jre.V11i2.2288

Google Scholar

[15] R. Syahputra And I. Soesanti, "Planning Of Hybrid Micro-Hydro And Solar Photovoltaic Systems For Rural Areas Of Central Java, Indonesia," Journal Of Electrical And Computer Engineering, Vol. 2020, 2020.

DOI: 10.1155/2020/5972342

Google Scholar

[16] R. Evayanti, "Evayanti, Restusari Analisa Kelayakan Pemenuhan Kebutuhan Air Minum Di Kawasan Pantai Selatan Kabupaten Lombok Timur," Jurnal Handasah, 2022.

Google Scholar

[17] R. Evayanti, "Studi Kinerja Jaringan Irigasi Pada Daerah Irigasi Renggung Kabupaten Lombok Tengah," Jurnal Teslink : Teknik Sipil Dan Lingkungan, Vol. 4, No. 2, 2023.

DOI: 10.52005/Teslink.V4i2.131

Google Scholar

[18] R. Evayanti And Sugiharta, "Simulasi Optimasi (Simop) Waduk Pengga Dan Waduk Batujai Pada Das Dodokan Untuk Pemenuhan Kebutuhan Air Baku Di Kawasan Ekonomi Khusus (Kek) Mandalika," Binawakya, Vol. 6, No. 1, 2021.

DOI: 10.29303/saintek.v7i1.3424

Google Scholar

[19] R. Evayanti, Sugiharta, And Juanita, "Analysis Of Water Availability In The Environmental Water Sources Of The Aikmampat River Sub-Region In Fulfilling The Need For Clean Water In The South Part Of Lombok Island," In Iop Conference Series: Earth And Environmental Science, 2024.

DOI: 10.1088/1755-1315/1321/1/012022

Google Scholar

[20] K. Kusnadi, A. Mulyono, G. Pakki, And G. Gunarko, "Rancang Bangun Dan Uji Performansi Turbin Air Jenis Kaplan Sekala Mikrohidro," Turbo : Jurnal Program Studi Teknik Mesin, Vol. 7, No. 2, 2018.

DOI: 10.24127/Trb.V7i2.817

Google Scholar